Commercial Projects

Our Projects

Latest Works

Tractor Supply

From start to finish, ground-breaking to grand opening, Planet Excavation was the dirt contractor of choice for this entire project. We played a crucial role in helping the store open ahead of schedule.

492729143_1236418085156763_2628657958950942588_n
492544011_1236417858490119_6291582266506220163_n
a yellow construction vehicle on a dirt road

Animas Mosquito Control District

We leveled a pad for a 10,000 sq. ft. building, dug foundation, built retaining walls, installed utilities, and completed the parking lot.

a dirt field with trees and mountains in the background
IMG_4988 2
IMG_4986
a tractor on a dirt road
a construction equipment on a dirt field

Cortez Meat Processing Facility​

Planet Excavation handled all site prep for the foundation, including clearing, grading, and excavation. We ensured a stable, level base ready for a concrete pour, meeting all specs for a solid build.

489083572_1213854857413086_5849353103976174502_n

Water Main
Line Extension

Planet Excavation installed a new water mainline in Bayfield, including trenching, pipe placement, and backfilling to ensure durability and meet standards.

493714314_1237469151718323_7937390831559785231_n
493539266_1237469238384981_8535141840836575348_n
494216795_1237469205051651_1837518580658976114_n
494107099_1237469405051631_9126469608995542644_n
494065682_1237469368384968_2147229096881172089_n

City of Durango
Stormwater Management

Performed a detailed installation of new permeable pavers and a drain pan, then repaved the alley that previously had no drainage.

e2f8d10a-32ab-43ad-b4fa-0e0e6b41436c
8a6bc7f9-81f2-4db1-8b65-b49226999461
3a2730ce-9e7f-4c4f-b3f3-aab2f37a4469
26824e14-9ce1-432d-925b-479ffa6af489
734ff6d5-57ea-4d6a-9b30-3a972426a62f

Apartment Complex Serwer Main Extention

Extended the apartment complex’s main sewer line to improve capacity and flow, including trench excavation, pipe placement, connections to existing utilities, and thorough backfilling to restore the site to its original condition.

492829711_1234326535365918_2564958339462684025_n
493155563_1234326488699256_279903741961702359_n
492399268_1234326545365917_4762308396902776057_n
492559871_1234326458699259_7987462291063354753_n
492394995_1234326425365929_7129988139020185909_n

City of Durango Access Road Reconstruction​

Reconstructed the City of Durango access road by repairing deep washouts, improving drainage, and regrading the surface to create a smoother, more stable access point.

493441481_1237561898375715_8668433155633272730_n
493535237_1237561885042383_3385119026135815372_n
493325060_1237561895042382_1522805305312640839_n
493581468_1237554485043123_4316797724181451786_n
494295642_1237561891709049_6416567325905783557_n
Trust and Worth

HomeAdvisor